Field Operations & Surveys
What lead time is required for field surveys?
Standard survey campaigns typically require two to four weeks for mission planning, logistics, and site clearance. However, for critical time-sensitive scenarios—such as natural disaster response, emergency flood monitoring, or urgent recovery efforts—we maintain rapid-deployment protocols to mobilize equipment and personnel significantly faster.
How do you handle restricted water access?
Our vessels are purpose-built for solo deployment wherever there is water access. A single operator can mobilize, pack in, and launch directly from unimproved banks, remote shorelines, docks, or small craft with zero shoreside support or crane infrastructure. For defense and expeditionary applications, the system is person-portable for low-signature staging.
What data deliverables do we receive?
Deliverables are tailored to your analytical workflows. Standard packages include raw high-rate sensor telemetry, calibrated and georeferenced point clouds or soundings, trajectory logs, and an operational quality-assurance report formatted for immediate import into GIS or hydrographic suites.
Engineering & Custom Integrations
Can you integrate proprietary hardware?
Depending on your operational requirements, we can integrate your hardware into our standard modular bays, fabricate custom mounting and interface connections, or—since we design and build our hulls in-house—engineer a custom hull tailored specifically to your payload.
Can you re-platform payloads from older craft?
Yes. For organizations with substantial investments in specialized payloads, we provide targeted consulting engagements to audit and re-platform existing hardware onto our modern autonomous drones, preserving your capital investments while upgrading vessel capabilities.